All posts

July 3, 20261 min read

What your electrician needs before a renovation starts

Trades are booked and cabinets are ordered, and the electrical layout is still a conversation nobody has had. Two documents prevent most change orders.

By the time we are called for a renovation, the cabinets are usually ordered and the drywall date is set. That is later than it needs to be.

The short version

Appliance specifications and a furniture plan, both before rough-in. Nearly every change order on a renovation traces back to a receptacle located against a drawing rather than against the thing that ended up in the room.

This is a placeholder body. The full article publishes from the Cited Platform blog workflow, which writes the title, slug, summary, body and publish date straight into this list.

Tell us what you need done.

Fast response and near-term availability across the Fraser Valley. Send the details and we’ll come back with a quote, or just call and talk it through.